Thameslink 2000

Thameslink 2000 - Closure Decision (896 kb)

This letter contains the decision of the Secretary of State on the proposals to discontinue passenger services and close parts of a network and stations in connection with Thameslink 2000.

Published:
18 October 2006

Thameslink: Statement of Reasons 2005 (4 Mb)

Thameslink: Details of proposed closures associated with the scheme.

Published:
30 January 2006

Erratum to Statement of Reasons 2005 (271 kb)

Section 5 Closure of King's Cross Thameslink Station Figure 5.1.

Published:
30 January 2006

Original SRA notice of closures associated with Thameslink project (661 kb)

Published:
30 January 2006

Thameslink: Original LTUC/LRPC Hardship reports Summer 2000 (134 kb)

Original reports produced by LTUC/LRPC on the effects on passengers of the proposed closures associated with Thameslink 2000: Farringdon and Moorgate.

Published:
30 January 2006

Thameslink: Original LTUC/LRPC Hardship reports Summer 2000 (47 kb)

Original reports produced by LTUC/LRPC on the effects on passengers of the proposed closures associated with Thameslink 2000: London Bridge and Blackfriars.

Published:
30 January 2006

Thameslink: Original LTUC/LRPC Hardship reports Summer 2000 (58 kb)

Original reports produced by LTUC/LRPC on the effects on passengers of the proposed closures associated with Thameslink 2000: King's Cross Thameslink Station.

Published:
30 January 2006

Thameslink: Original Statement of Reasons 1999 (2 Mb)

Published:
30 January 2006

Thameslink: Original Statement of Reasons 1999 (2 Mb)

Annexe 1.

Published:
30 January 2006

Thameslink: Original Statement of Reasons 1999 (2 Mb)

Plan drawings.

Published:
30 January 2006

Thameslink - Minister to LTUC inviting a hardship report on proposed closures (122 kb)

Letter from Minister to Chairman of London Transport Users Committee inviting it to reinvestigate the passenger hardship likely to arise if the proposed closures associated with the Thameslink project go ahead.

Published:
30 January 2006