This road project has now been completed. This page will be available for 6 months from the date of scheme completion, after which time you will only be able to access this information on The National Archive version of this page.

A64 carriageway resurfacing works between the A1(M) Bramham and Malton

Project status:   Completed


Start date:   15 September 2014
End date:  29 March 2015


Type:   Improvement Scheme
help icon

Improvement Scheme

Part of our programme of improvements (generally with value <£10m)

Cost:  £1.99 million


Managed by:   Area 12

-

Where was the project located?

The project completed was located at A64 between the A1(M) at Bramham and Malton.

Why was the scheme needed?

The scheme was required to as the current road surface life expired and was in need of replacing.

What work was carried out?

The scheme carried out carriageway patching and resurfacing (up to 100mm deep), the renewal of road markings and road studs, and associated works including the reinstatement of traffic loops and renewing damaged road gullies.

How did this benefit road users?

The expected outcome of this work will prolong the life of the carriageway and reduce the need for future intervention. On completion of the works there should be a benefit to road users through improved ride quality and safety.

Between Tadcaster and Bilbrough Top solar powered road studs were installed after the resurfacing has taken place. This will improve the delineation of the route and should improve the safety of this section of road.

How do I find out more information ?

If you have any queries about this project you should contact the Highways Agency Information Line by emailing ha_​info@​highways.​gsi.​gov.​uk or calling 0300 123 5000.