This snapshot, taken on
06/04/2012
, shows web content acquired for preservation by The National Archives. External links, forms and search may not work in archived websites and contact details are likely to be out of date.
 
 
The UK Government Web Archive does not use cookies but some may be left in your browser from archived websites.

Latest traffic information

Breadcrumb Navigation

You are here:

  1. »
  2. Home »
  3. Road Projects »
  4. Road Projects »
  5. Area 1 »
  6. Road Project

Website Navigation

Useful Links

Quick Links

Map Based Road Projects Finder - Feedback

We are currently piloting a new map based tool to help you find road projects. Please let us know what you think

The Project Control Framework

This framework sets out how we, together with the Department for Transport, manage and deliver major road improvement projects.

A30 Exeter to Bere Regis

A30 Exeter to Bere Regis

Status
Current
Located in
Area 1Map of the Agency's Operational Areas
Scheme type
Design, Build, Finance and OperateRoad Schemes Managed by the Highways Agency
Updates
Get email alerts when we publish new information Get email alerts when we publish new information

The Project

The A30 Trunk Road from Exeter to Honiton, and the A35 Trunk Road from Honiton to Bere Regis, is a privately run road set up under a contract between the Secretary of State for Transport and Connect A30/A35 Limited. At the western end of this route the contract required Connect to build 13.67 miles (22km) of dual carriageway between Exeter and Honiton in Devon, to replace the existing substandard and congested road. It also required Connect to build a 5.59 mile (9km) dual carriageway bypass to take trunk road traffic out of the picturesque villages of Puddletown and Tolpuddle in Dorset. The remainder of the route is mainly unimproved single carriageway with occasional sections of dual carriageway. The A30/A35 is an important part of the main traffic route running east/west along the South Coast of England. In holiday periods it takes large numbers of visitors to and from the West Country.

Key Data

Length of Project Road 63.38 miles (102km)
Estimated Construction Cost £75.7 million *
Contract Award 24 July 1996
Commencement 1 October 1996
First Opened to Traffic Puddletown bypass - 16th April 1999 & Honiton to Exeter - 9th February 2000
End of Contract Period 30th March 2026
DBFO Company Connect A30/A35 Limited
Type of Road Single & Dual Carriageway
Shareholders Balfour Beatty Investment and Barclays Infrastructure Investors Ltd
Contractors Balfour Beatty, Tilbury Douglas, Deutsche Asphalt GmbH

(* = Value taken from pre-qualification document)

Discussion

The A30/A35 Exeter to Bere Regis was one of the first 8 contracts in the £1billion Design, Build, Finance and Operate (DBFO) programme. The contract was awarded to Connect A30/A35 Limited, a consortium of companies comprising BICC plc, Philipp Holzmann AG and WS Atkins. Following subsequent changes the shareholder is Balfour Beatty Investment .

Connect's concession is for a period of 30 years. As well as the cost of construction and the operation and maintenance of the two new build sections Connect are also responsible for the remainder of the existing road. The payments it receives in return for its investment are calculated on the number of vehicle kilometres travelled on the road, there is no direct payment of tolls by road users. Connect and the Highways Agency (acting for the Secretary of State) ensure compliance with the contract, which was established under the terms of the Government's Private Finance Initiative.

Connect engaged BBTA Joint Construction Venture to build the two new dual carriageway sections of the route between Exeter and Honiton, and a bypass for Tolpuddle and Puddletown.

At present Connect employ South West Highways- Balfour Beatty Infrastructure Services (Connect Joint Venture) to carry out the routine and winter maintenance work, but the Company retains responsibility for the road. The Secretary of State remains the Highway Authority.