This snapshot, taken on
05/08/2011
, shows web content acquired for preservation by The National Archives. External links, forms and search may not work in archived websites and contact details are likely to be out of date.
The UK Government Web Archive does not use cookies but some may be left in your browser from archived websites.
Rookery South Energy from Waste Generating Station
The documents on this page are those that have been submitted by the developer.
Letter
Letter of ApplicationApplication Form
Copies of newspaper notices
Copies of notices placed in the newspaper in accordance with Regulation 4 Applications (Prescribed Forms & Procedure) Regulations 2009Development Consent Order
The draft proposed OrderExplanatory memorandum
Explanatory Memorandum to draft proposed OrderEnvironmental Statement Volume I - Figures
Environmental Statement pursuant to the Infrastructure Planning (Environmental Impact Assessment) Regulations 2009Environmental Statement Volume II
Environmental Statement pursuant to the Infrastructure Planning (Environmental Impact Assessment) Regulations 2010Environmental Statement Volume III - Appendices
Environmental Statement pursuant to the Infrastructure Planning (Environmental Impact Assessment) Regulations 2011Non-technical Summary
Non-technical summary pursuant to Schedule 4 of the EIA RegulationsEnvironmental Statement Volume I
Environmental Statement pursuant to the Infrastructure Planning (Environmental Impact Assessment) Regulations 2009Works Plans - Key Plan
Work Plans - Key PlansApplication Site Plan Order Limits Plan
Application Site Plan/Order Limits PlanRRF Site Section
RRF Site SectionsRRF Roof Plan
RRF Roof PlansProposed access road with proposed 2.5m footpath at level crossing
Proposed access road Proposed 2.5m footpath at level crossingLand Plan
Rights of Way Plan
EfW Facility South Elevation
EfW Facility North Elevation
EfW Facility East Elevation
EfW Facility West Elevation
EfW Facility East Sectional Elevation
EfW Facility West Sectional Elevation
RRF Tertiary Building Elevations
RRF North and South Elevations
RRF East and West Elevations
RRF Boundary Details
Proposed Access road existing footpath width at level crossing
Proposed access to The Rookery Resource Facility Proposed cross section
Level Crossing
Landscape Strategy
Planting Strategy - Wider Site
Secondary Buildings Elevations - MRF
Lighting Layout and Strategy Operational Area
Lighting Layout & Strategy Operational AreaOperational Area Masterplan and Green Lane Country Park and RRF Entrance
Operational Area Masterplan & Green Lane Country Park & RRF EntrancePlanting Strategy - Operations Area and Green Lane Country Park and RRF Entrance
Planting Strategy - Operations Area and Green Lane Country Park & RRF EntranceTrees to be removed retained
Trees to be removed/retainedWorks Plans - 1 of 2
Work Plans - 1 of 2Works Plans - 2 of 2
Work Plans - 2 of 2Land Plan Extinguishment of Rights - Key Plan
Land Plan: Extinguishment of Rights - Key PlanLand Plan Extinguishment of Rights - 1 of 4
Land Plan: Extinguishment of Rights - 1 of 4Land Plan Extinguishment of Rights - 2 of 4
Land Plan: Extinguishment of Rights - 2 of 4Land Plan Extinguishment of Rights - 3 of 4
Land Plan: Extinguishment of Rights - 3 of 4Land Plan Extinguishment of Rights - 4 of 4
Land Plan: Extinguishment of Rights - 4 of 4Statement of Engagement
Statement pursuant to s79(1) Environmental Protection ActConsultation Report
Report produced in accordance with section 37(3)(c) of the Planning Act 2008Consultation Report - Appendices
Report produced in accordance with section 37(3)(c) of the Planning Act 2008Report on Natural Features
Report explaining the inapplicability of Regulation 5(2)(l)Report as to effects on European Sites
Report explanation not applicableHistoric Environment Report
Report explaining the inapplicability of Regulation 5(2)(m)Flood Risk Assessment
Report assessing flood risks associated with the ProjectFlood Risk Assessment - Appendices
Report assessing flood risks associated with the ProjectGrid Connection Statement
Statement of responsibility for grid or pipeline connectionHealth Impact Annex A
Overview of the Project's implications for healthDesign and Access Statement
Statement in respect of the design and accessibility of the Project according to the requirements of Article 4C of the Town and Country Planning (General Development Procedure) Order 1995 (as amended)Combined Heat and Power Report
Strategy for development of the Project as a combined heat and power resourceWRATE, Carbon and Efficiencies of Scale Report
Report on the Waste Resources Assessment Tool for the Environment, carbon and environmental efficienHeads of Terms
Draft Heads of Terms of proposed development consent obligation between the Applicant and relevant local authoritiesPlanning Statement
Statement of the relevant policy (national and local) and other factors relating to planning matters in support of the ProjectAlternative Site Assessment Report
Assessment of alternative sites for the purposes of the ProjectNeed Assessment
Assessment of the need for the PojectEconomic Statement
Statement of the economic viability of the ProjectHealth Impact Assessment
Overview of the Project's implications for healthDesign and Access Statement Drawings
Statement in respect of the design and accessibility of the Project according to the requirements of Article 4C of the Town and Country Planning (General Development Procedure) Order 1995 (as amended)Engineering Design Statement
Statement on aspects of the engineering design of the ProjectRail Feasibility Report
Report on the feasibilty of serving the ProjectTransport Assessment 1-17
Asseessment of the transport matters relating to the ProjectTransport Assessment 18-35
Asseessment of the transport matters relating to the ProjectTravel Plan
"Proposed travel plan in respect of travel matters relating to staff at the RRFSustainability Assessment
Assessment of the sustainability of the ProjectWRATE, Carbon and Efficiencies of Scale Report - Annex A
Report on the Waste Resources Assessment Tool for the Environment, carbon and environmental efficienStatement of Reasons
Statement of reasons why compulsory purchase powers in draft proposed Order are justifiedFunding Statement
Statement of how claims for compensation in relation will be metBook of Reference parts 1-5
Details of those interests in land over which compulsory purchase powers are soughtEnvironmental Statement Volume III - Appendices to Chapter 13
Need Assessment - Annex A
Environmental Statement Supplement and Non-Technical Summary (Document reference 3.5)
Report on Natural Features Supplement
Report on Effects on European Sites Supplement
Consultation Report Supplement