Document Map
This document map lists all the documents featured on the website. If you can’t find the document you are looking for try using the Search box on the right.
- Cycling City, Cycling Towns
- Who We Are
- Health & Fitness
- Smart Measures Portfolio
- Aylesbury Gemstone
- Aylesbury Gemstone Cycleways
- Marketing Cycling Handbook
- sm00_introduction.pdf
- sm01_understanding_the_potential_cycling_market.pdf
- sm02_personal_travel_planning.pdf
- sm03_targeted_marketing_of_specific_routes.pdf
- SM04 Promotional Events
- SM05 Cycle route information maps and signage
- sm06_residential_travel_plans.pdf
- sm07_cycling_and_public_transport.pdf
- SM08 Cycle training programmes
- SM09 Cycling to work
- sm10_cycling_to_school.pdf
- sm11_cycling_to_shops.pdf
- sm12_recreational_cycling.pdf
- SM13 Reaching types of people who are less likely to cycle
- Smart Measures Overview
- Cycling to School
- Travel Plans and Wider Engagement
- Marketing & Promotion
- Integration within Policy & Strategy
- A Cycling Strategy for the University of Exeter
- Feedback from client (pdf)
- Great Waltham Cycling Village Initiative, Essex
- Liverpool Cycle Officer, May 2006 (pdf)
- Main Report (pdf)
- Norwich Cycling Action Plan
- Review of Cycling Development Action Plan, Cumbria CC (pdf)
- Review of Cycling Strategy, Blackburn with Darwen Borough Council (pdf)
- Role description, written by cycling officers attending a course run by the CTC, December 2005 (pdf)
- Sources of Funding (pdf)
- The Role of Cycling in Cutting Carbon
- Worcestershire: Walk / Cycle Officer, November 2005 (pdf)
- Benefits of Cycling
- Design Checklist & Guidance
- a01_invisible_infrastructure
- a02_speed_reduction
- a03_traffic_calming
- a04_clear_space
- a05_exemptions_to_traffic_regulation_orders
- a06_contra-flow_cycling
- a07_vehicle_restricted_areas
- a08_signal_controlled_junctions
- a09_advanced_stop_lines
- a10_bus_lanes_and_bus_stops
- a11_cycle_lanes
- a12_removal_of_road_centrelines
- a13_roundabouts
- a14_corner_radii
- a15_audits_and_risk_assessment
- b01_connections_and_links
- b02_road_crossings_side_roads
- b03_road_crossings_mid_link
- b04_junction_and_forward_visibility
- b05_footway_crossings_and_tactile_paving
- b06_flush_kerbs
- b07_cycle_track_junctions
- b08_access_and_speed_controls
- b09_obstruction_of_cycle_track_accesses
- b10_wheeling_channels
- c01_headroom
- c02_surfaces
- c03_signs
- C04 Cycle Parking
- c05_monitoring
- c06_maintenance
- C07 Integrating Cycling Into Development Proposals
- c08_drainage
- c09_gradients
- c10_lighting
- c11_cyclists-and-junctions
- cycle_security_for_cyclists
- Design Checklist
- Design Principles
- Infrastructure for Cyclists
- Bike Park Management Model, Leicester City Council
- Consultative Site Visits, Bristol and South Gloucestershire
- Cycle Parking Options Study, Somerset CC (pdf)
- Cycle Parking Options Study, Somerset CC (pdf)
- Cycle Parking Options Study, Somerset CC (pdf)
- Cycle Parking Options Study, Somerset CC (pdf)
- Cycle Schemes and Legal Procedures
- Cycling in Pedestrian Areas (pdf)
- Cycling Infrastructure and Road Safety Audit 23.04.09
- GMPTE's Bike Locker Users' Club
- Hierarchy of Measures presentation
- Infrastructure Toolkit for Cycling Towns (Draft)
- Motorcycle Barriers, Nottingham
- planning-for-cycling-exec-summary-10-3-09
- planning-for-cycling-report-10-3-09
- Providing for Cycling and the Public Realm, Dr Jo Cleary, Cycling England (pdf)
- Puffin Style Cycle Crossings, Cambridge City Council (pdf)
- Sea Front Cycling Issue 7
- sea_front_cycling_issue_5_jun08
- Section 1 - Introduction (pdf)
- Section 2 - Signs (pdf)
- Section 3 - Lining and surface marking (pdf)
- Section 4 - Surface (pdf)
- Section 5 - Necessary evils (pdf)
- Section 6 - Cycle parking (pdf)
- Section 7 - Invisible infrastructure (pdf)
- Section 8 - Bold statements, further information (pdf)
- Side Road Crossings, Buckinghamshire
- Wheeling Ramps Leighton Linslade.pdf
- Highway Improvements & Maintenance Opportunities
- A390 West of County Hall Truro, Cornwall County Council (pdf)
- Crossing of Narrow Bridge, Lincolnshire CC (pdf)
- DfT Cycle Audit of new schemes (pdf)
- DfT Cycle Review of existing road network (pdf)
- Inner Ring Road Report, Northampton
- Removing Centre Lines (pdf)
- Sources of Funding (pdf)
- Tameside MBC: Guide Lane-Denton Road ASL audit
- Tuckton Bridge, Bournemouth Borough Council (pdf)
- Development Planning Opportunities
- Support Team
- Aylesbury
- Brighton & Hove
- Bristol
- Blackpool
- Cambridge
- Chester
- Colchester
- Darlington
- Derby
- Exeter
- Lancaster
- Leighton-Linslade
- Shrewsbury
- Southend
- Southport & Ainsdale
- Stoke-on-Trent
- Woking
- York
- Level 3
- Monitoring & Evaluation
- Integration with Public Transport
- Member Support
- Professional Support
- Journey Planner
- Health Benefits of Cycling
- Board Action Notes
- 2009-06-03-ce-board-mtg-action-notes-final
- 2009-08-19-ce-board-mtg-action-notes-final
- 2009-08-19_ce_board_mtg_action_notes
- 2009-09-02_ce_board_mtg_action_notes
- 2009-10-21_ce_board_mtg_action_notes
- ce_board_mtg_060606_action-notes
- ce_board_mtg_100506_action_notes
- ce_board_mtg_160307_action_notes1
- ce_board_mtg_160507_action_notes
- ce_board_mtg_171208_action_notes
- ce_board_mtg_231106_action_notes
- ce_board_mtg_261006_action_notes
- ce_board_mtg_290107_action_notes
- ce_board_mtg_300806_action_notes
- ce_board_mtg_300908_action_notes
- ce_meeting_10th-11th_jul_2007_action_notes
- ce_meeting_note_250106
- Results from the first three years
- 'Lift Off' for Cycling
- Analysis and synthesis of evidence on the effects of investment in six Cycling Demonstration Towns
- Monitoring Project Report 2006-09-appendix
- Monitoring Project Report-2006-09
- planning-for-cycling-report-10-3-09
- Valuing Increased Cycling in the Cycling Demonstration Towns
- valuing-the-benefits-of-cycling-full




