This snapshot, taken on
26/09/2008
, shows web content acquired for preservation by The National Archives. External links, forms and search may not work in archived websites and contact details are likely to be out of date.
 
 
The UK Government Web Archive does not use cookies but some may be left in your browser from archived websites.
Latest
Home » Road Projects » Area 14 » Road Project
Contact us

by phone or email

Register for
email alerts

On information that's important to you

Feature

Disabled Driver Questionnaire

We want to produce a driver information programme for our disabled customers. To help us produce the best possible guidance, please take a few minutes to fill in our questionnaire.

Feature

Better information for your journey

The National Traffic Control Centre collects real-time information on road conditions.

Quick Links

The Project Control Framework

On 1st April 2008 we launched the Project Control Framework. The Framework sets out how we, together with the Department for Transport, manage and deliver major improvement projects.

Traffic news on your desktop

Helpful ways to access the latest traffic information when you need it.

A66 Surtees Bridge Replacement

A66 Surtees Bridge Replacement

Status
Completed
Located in
Area 14Map of the Agency's Operational Areas
Scheme type
OtherRoad Schemes Managed by the Highways Agency

The Project

The structure carrying the A66 Dual carriageway over the River Tees has been replaced by a new wider 3-lane structure, which accommodates the slip roads to and from the new South Stockton Link Road.

The £14.3M contract was awarded to Edmund Nuttall Ltd on 13 February 2006.

Why the bridge needed replacing

The old bridge did not meet all the engineering standards required to take the latest 40 tonne heavy goods vehicles. Studies had also shown that there were problems with the concrete bridge supports below the water line and with ground conditions on the east embankment. If left this could have become serious in the longer term.

What has happened so far?

Work started on 20 March 2006 and was completely open to vehicular traffic on the 3rd December 2007.

Work to construct the new cycleway and the footpath network under the bridge was completed on 22 January 2008.  The bridge was formally opened on the 23 January 2008.

Two newsletters have been produced and can be accessed via the Publications section in the right hand menu. We will provide updates as regularly as possible but if you have any further enquiries please email:

a66surteesbridge_replacement@highways.gsi.gov.uk

Or contact the Highways Agency Information Line on: 08457 50 40 30.