Channel Tunnel Rail Link Act 1996
1996 Chapter 61 - continued
SCHEDULE 1, SCHEDULED WORKS, Description of works - continued

back to previous text
 
      In the borough of Maidstone, parish of Lenham, and in the borough of Ashford, town of Ashford and parishes of Charing, Hothfield and Westwell, in the county of Kent-
 
Lenham Heath to Ashford Barracks
        Work No. 15- A railway (11,342 metres in length) commencing by a junction with the railway (Work No. 14) at its termination, passing south-eastwards under Egerton Road (Work No. 15C), Newlands Road (Work No. 15F) and Pluckley Road (Work No. 15G), passing eastwards in tunnel for a distance of 115 metres beneath Leacon Lane (Work No. 15J), and under the A20 (Maidstone Road) (Work No. 15K) then continuing south-eastwards over the M20 at a point 50 metres west of the bridge carrying the Maidstone and Ashford Railway over the motorway at Tutt Hill, passing under Westwell Lane (Work No. 15M) and over Station Road (Work No. 15N), under the A20 (Work No. 15P) and over Godinton Lane (Work No. 15Q) and terminating at a point in Rowcroft Barracks 530 metres north-west of the existing junction of Godinton Road with Chart Road, including bridges over the M20, Station Road and Godinton Lane;
 
        Work No. 15A- A railway (2,576 metres in length) on the northern side of the railway (Work No. 15) commencing by a junction with that railway at a point 360 metres east of its commencement, passing eastwards under Egerton Road (Work No. 15C) and terminating by a junction with Work No. 15 at a point 125 metres north-west of the intended bridge carrying Newlands Road (Work No. 15F) over that railway;
 
        Work No. 15B- A railway (2,576 metres in length) on the southern side of the railway (Work No. 15) commencing by a junction with that railway at the said point 360 metres east of its commencement, passing eastwards under Egerton Road (Work No. 15C) and terminating by a junction with Work No. 15 at the said point 125 metres north-west of the intended bridge carrying Newlands Road (Work No. 15F) over that railway;
 
        Work No. 15C- Realignment of Egerton Road, including a bridge over the railways (Works Nos. 15, 15A and 15B), commencing in that road at a point 5 metres south-west of the southern end of the bridge carrying it over the M20, passing north-eastwards over those railways and terminating in Egerton Road at a point 130 metres north-east of its junction with Vicarage Lane;
 
        Work No. 15D- Realignment of Vicarage Lane commencing in that road at a point 65 metres north of its junction with Egerton Road and terminating at that road junction;
 
        Work No. 15E- Diversion of Hurst Lane (D1198) at its junction with Newlands Road commencing in Hurst Lane at a point 260 metres north-west of that existing road junction, passing eastwards and terminating by a junction with Newlands Road (Work No. 15F) at a point 75 metres north of the said existing road junction;
 
        Work No. 15F- Realignment of Newlands Road (D1199), including a bridge over the railway (Work No. 15), commencing in that road at a point 15 metres north of the northern abutment of the bridge carrying that road over the M20, passing northwards over the railway, then north-eastwards and terminating in Newlands Road at a point 135 metres north-east of its junction with Hurst Lane;
 
        Work No. 15G- Realignment of Pluckley Road (C493), including a bridge over the railway (Work No. 15), commencing in that road at a point 25 metres south-west of the southern end of the bridge carrying it over the M20, passing north-eastwards and northwards over the motorway and the railway and terminating in Pluckley Road at a point 65 metres north of its existing junction with Leacon Lane;
 
        Work No. 15H- Diversion of Leacon Lane between Pluckley Road and Leacon Alders commencing by a junction with Pluckley Road at its existing junction with Leacon Lane, passing eastwards then south-eastwards under the railway (Work No. 15) and terminating in Leacon Lane at a point 195 metres west of the bridge carrying that road over the stream at Leacon Alders, including access to Oakover Nursery and Raywood Cottages and to the emergency access to the M20;
 
        Work No. 15J- Realignment of Leacon Lane east of Leacon Alders commencing in that road at a point 240 metres east of its junction with Hurstford Lane, passing north-eastwards over the railway (Work No. 15) in tunnel, and terminating in Leacon Lane at a point 200 metres south-west of its junction with the A20 (Maidstone Road);
 
        Work No. 15K- Diversion of the A20 (Maidstone Road), including a bridge over the railway (Work No. 15), commencing in that road at a point 25 metres north of its junction with Leacon Lane, passing south-eastwards over the railway on the western side of the existing road and terminating in the A20 at the north-western end of the bridge carrying that road over the M20, including access to Leda Cottages at a point 35 metres north-west of that termination;
 
        Work No. 15L- A road for access to premises on the eastern side of the existing A20 commencing by a junction with the A20 (Work No. 15K) at a point on its eastern side 205 metres south-east of its commencement, passing eastwards, then south-eastwards and terminating by a junction with the remaining part of the existing road at a point 285 metres south-east of the commencement of Work No. 15K;
 
        Work No. 15M- Diversion of Westwell Lane (D1227) commencing in that road at the southern end of the bridge carrying it over the M20, passing southwards on the eastern side of the existing road, then south-westwards over the Maidstone and Ashford Railway and the railway (Work No. 15), then passing south-eastwards and southwards and terminating in that road at a point 180 metres south of the southern abutment of the existing bridge carrying that road over the Maidstone and Ashford Railway, including a bridge over that railway and Work No. 15;
 
        Work No. 15N- Realignment of Station Road, Westwell, commencing in that road at a point 15 metres south-west of the bridge carrying the Maidstone and Ashford Railway over that road, passing south-westwards under the railway (Work No. 15) and terminating in Station Road at a point 220 metres south-west of that commencement;
 
        Work No. 15P- Diversion of the A20 (Maidstone Road), including a bridge over the railway (Work No. 15), commencing in that road at a point 405 metres north-west of the entrance to Yonsea Farm, passing eastwards on the northern side of the existing road, over the railway, then south-eastwards and terminating in that road at a point at Potters Corner 25 metres south-east of the junction with that road of Godinton Lane;
 
        Work No. 15Q- Diversion of Godinton Lane commencing in that road at a point 225 metres south-west of its junction with the A20, passing south-westwards on the western side of the existing road, under the railway (Work No. 15) and terminating in Godinton Lane at a point 10 metres north-east of the access to North Lodge;
      In the borough of Ashford, town of Ashford and parish of Sevington, in the County of Kent-
 
Ashford Barracks to Sevington
        Work No. 16- A railway (4,535 metres in length) commencing by a junction with the railway (Work No. 15) at its termination, passing south-eastwards to a point 130 metres north-west of the existing junction of Godinton Road with Chart Road, then in tunnel for a distance of 565 metres beneath Chart Road (Work No. 16F) and Godinton Road (Works Nos. 16G and 16H), the railway (Work No. 16A) and the Maidstone and Ashford Railway (Work No. 16C), then under Beaver Road (Work No. 16N), over the Great Stour and the East Stour Rivers, the Ashford and Canterbury Railway and the railways (Works Nos. 16C and 16D), then over the railways (Works Nos. 16A and 16E), under Boys Hall Road (Work No. 16Q), and terminating at a point 225 metres west of the western side of the existing bridge carrying Bad Munstereifel Road over the Ashford and Folkestone Railway at Sevington, including bridges over Works Nos. 16A, 16C, 16D and 16E, the Great Stour and the East Stour Rivers, the Ashford and Canterbury Railway, and the Aylesford Stream (Work No. 16S);
 
        Work No. 16A- A railway (4,555 metres in length) commencing by a junction with the railway (Work No. 16) at a point 5 metres south-east of the commencement of that work, passing south-eastwards on the northern side of that railway, in tunnel for a distance of 405 metres beneath Chart Road (Work No. 16F), then passing southwards over the railway (Work No. 16) in tunnel, then south-eastwards and eastwards under Beaver Road (Work No. 16N), on existing bridges over the Great Stour and the East Stour Rivers, under Work No. 16, and Boys Hall Road (Work No. 16Q) and terminating by a junction with Work No. 16 at its termination, including bridges over Work No. 16K and the Aylesford Stream (Work No. 16S);
 
        Work No. 16B- A railway (4,550 metres in length) commencing by a junction with the railway (Work No. 16) at a point 5 metres south-east of the commencement of that work, passing south-eastwards on the southern side of that railway, in tunnel for a distance of 475 metres beneath Chart Road (Work No. 16F) and Godinton Road (Works Nos. 16G and 16H), passing south-eastwards and eastwards under Beaver Road (Work No. 16N), on existing bridges over the Great Stour and East Stour Rivers, under Boys Hall Road (Work No. 16Q) and terminating by a junction with Work No. 16 at its termination, including bridges over Work No. 16K and the Aylesford Stream (Work No. 16S);
 
        Work No. 16C- A railway (2,228 metres in length) commencing by a junction with the Maidstone and Ashford Railway at a point 200 metres north-west of the bridge carrying the Godinton Road over that railway, passing south-eastwards over the railway (Work No. 16) in tunnel, under Beaver Road (Work No. 16N), on existing bridges over the Great Stour and East Stour Rivers and terminating by a junction with the Ashford and Canterbury Railway at a point 70 metres east of the intended bridge carrying Work No. 16 over that railway, including a bridge over Work No. 16K;
 
        Work No. 16D- A railway (954 metres in length), forming sidings on the Ashford and Canterbury and Ashford and Folkestone Railways, commencing at a point 45 metres south-east of the eastern abutment of the bridge carrying that railway over the East Stour River, passing south-eastwards on the southern side of the railway (Work No. 16C) to a junction with the Ashford and Canterbury Railway, then passing eastwards under the railway (Work No. 16) then south-eastwards and terminating at a point 125 metres north-west of the junction of Bentley Road with Hunter Avenue and Aylesford Place, including railway sidings;
 
        Work No. 16E- A railway (748 metres in length) commencing by a junction with the railway (Work No. 16A) at a point 140 metres north-west of the intended bridge carrying the railway (Work No. 16) over that railway, passing south-eastwards under Work No. 16, on the northern side of Work No. 16A and terminating at a point 92 metres south-east of the eastern side of the existing Aylesford Place level crossing (to be stopped up), including railway sidings;
 
        Work No. 16F- Realignment of the A28 (Chart Road) commencing in that road at a point 45 metres east of the junction of Hilton Road with that road, passing eastwards over the railways (Works Nos. 16, 16A and 16B) in tunnel and terminating in that road at a point 3 metres west of the western side of the bridge carrying the Maidstone and Ashford Railway over that road;
 
        Work No. 16G- Realignment of Godinton Road (B2074) and Carlton Road (E1467) commencing by a junction with Chart Road (Work No. 16F) at the existing junction of that road with Godinton Road, passing south-eastwards on the line of that road over the railway (Work No. 16B) in tunnel, then passing south-westwards on the line of Carlton Road and terminating in that road at a point 63 metres south-west of its junction with Godinton Road;
 
        Work No. 16H- A road commencing by a junction with Godinton Road (Work No. 16G) at a point 80 metres south-east of its existing junction with Chart Road, passing north-eastwards over the railways (Works Nos 16, 16A and 16B) in tunnel, then south-eastwards over the Maidstone and Ashford Railway (Work No. 16C) and terminating in Godinton Road at a point 45 metres north-west of its junction with James Street, including a bridge over the Maidstone and Ashford Railway (Work No. 16C);
 
        Work No. 16J- Realignment of Bridge Road commencing in that road at a point 45 metres south-west of its existing junction with Godinton Road, passing north-eastwards, and terminating by a junction with Work No. 16G at that road junction;
 
        Work No. 16K- An access road and cycle track commencing in Gasworks Lane at a point 30 metres south of its junction with the A292 (Elwick Road), passing south-westwards for a distance of 108 metres, on the western side of Gasworks Lane (to be stopped up), over the railway (Work No. 16), then continuing as a cycle track south-westwards, then eastwards and westwards, under the railways (Works Nos. 16A, 16B and 16C) and the Tonbridge and Ashford Railway, and terminating in Gasworks Lane at a point 10 metres south of the southern end of the existing bridge carrying that last mentioned railway over that road, including a bridge over Work No. 16;
 
        Work No. 16L- A road commencing by a junction with Leacon Road at its junction with Norfolk Drive, passing eastwards and terminating by a junction with Gasworks Lane at a point 120 metres south of the southern end of the bridge carrying the Tonbridge and Ashford Railway over that road;
 
        Work No. 16M- A cycle track commencing by a junction with the footpath AU 37 at a point 32 metres south of its junction with the A292 (Elwick Road), passing south-westwards over the railways (Works Nos. 16, 16A, 16B and 16C), the Maidstone and Ashford and the Tonbridge and Ashford Railways, then passing westwards, then eastwards and terminating by a junction with the footpath at a point 5 metres south-west of the southern end of the footbridge carrying that footpath over the Tonbridge and Ashford Railway;
 
        Work No. 16N- Diversion of the A2070 (Beaver Road) commencing in that road at its junction with the A292 (Elwick Road and Station Road), passing southwards over the railways (Works Nos. 16, 16A, 16B and 16C) and terminating in the A2070 at its junction with the Romney Marsh Road, including a bridge over the said railways and a junction roundabout at that termination;
 
        Work No. 16P- A cycle track commencing at the southern end of Alsops Road, passing eastwards, then westwards and eastwards, then southwards over the railways (Works Nos. 16, 16A and 16B) and the Ashford and Folkestone Railway, then continuing westwards and eastwards and terminating by a junction with Crowbridge Road at a point 60 metres west of the junction of that road with Gladstone Road;
 
        Work No. 16QQ- Diversion of Boys Hall Road and Canterbury Road (E1466), including a bridge over the Ashford and Folkestone Railway in place of the existing bridge over that railway and over the railways (Works Nos. 16, 16A and 16B) and the new road (Work No. 16RR), commencing in Boys Hall Road at a point 215 metres north-east of the existing junction of Crowbridge Road with that road, passing south-westwards over Works Nos. 16, 16A and 16B, the Ashford and Folkestone Railway and Work No. 16RR on the eastern side of the existing road and terminating in Canterbury Road at a point 150 metres south-west of that existing road junction;
 
        Work No. 16RR- A road, forming in part a realignment of Crowbridge Road (D4488), commencing in that road at a point 230 metres north-west of its existing junction with Canterbury Road, passing south-eastwards under Work No. 16QQ then passing southwards, south-westwards and south-eastwards and terminating at a roundabout in the northern corner of Orbital Park, Ashford, at a point 520 metres north-west of the junction of Bad Munstereifel Road (Work No. 17A) with the access road to Orbital Park, Ashford;
 
        Work No. 16RR(1)- A road commencing by a junction with the new road (Work No. 16QQ) at a point 40 metres north-east of the junction of Mead Road with Canterbury Road, passing south-eastwards and terminating by a junction with Work No. 16RR at a point 120 metres south-east of that road junction;
 
        Work No. 16S- A cut, forming a diversion of the Aylesford Stream, commencing in that stream at a point 185 metres upstream from the northern side of the bridge carrying the Ashford and Folkestone Railway over that stream, passing westwards under the railways (Works Nos. 16, 16A and 16B) and terminating in that stream at a point 5 metres north of the southern side of the said bridge;
 
        Work No. 16T- A railway (1,201 metres in length), forming sidings, commencing by a junction with the Ashford to Canterbury Railway at a point 4 metres south of the southern side of the bridge carrying Hythe Road over that railway, passing southwards, westwards then north-westwards and terminating in the Ashford Goods Yard at a point 200 metres east of the south-western side of the bridge carrying the Ashford to Folkestone Railway over the East Stour river;
 
        Work No. 16U- A railway (100 metres in length), forming a cross-over, commencing by a junction with the railway (Work No. 16E) at a point 60 metres west of the junction of Bentley Road with Hunter Avenue and Aylesford Place, passing south-eastwards and terminating by a junction with the railway (Work No. 16A) at a point 85 metres south of that road junction;
continue