|
Ellon |
(TotalFinaElf) |
||||
|
Offshore gas and condensate field in production. |
|||||
|
Block and licence number: |
3/15, P.090 |
||||
|
Map reference: |
|||||
|
Grid reference: |
1° 49’ E 60° 36’ N |
||||
|
Licensees and company interest in field (%) at end of February 2002: |
|||||
|
TotalFinaElf Exploration UK plc |
33.33 |
||||
|
Elf Exploration UK plc |
66.67 |
||||
|
Date of discovery: |
October 1973 |
||||
|
Production start: |
December 1994 |
||||
|
Operator’s estimate of: |
|
||||
|
Recoverable reserves originally present (billion cubic metres): |
Gas: 3.79 |
||||
|
First year of peak production: |
1996 |
||||
|
Peak production (billion cubic metres per year): |
0.90 |
||||
|
Water depth: |
135m |
||||
|
Transport system: |
Pipeline to St. Fergus via Alwyn and Frigg. |
||||
|
Extension into other UK blocks: |
Block number, licence number and licensee/company interest in block (%) at end of 2000: 3/14a, P.090
|
||||