| Royal Engineers - Python |
| |
 |
|
The Engineers' Python has many times more destructive power than its namesake.
It's a system for clearing minefields, consisting of a rocket attached to a hose filled with explosive, which is carried in a special trailer.
The trailer is positioned 150 m from the edge of the minefield and the rocket's then fired, propelling the explosive-filled hose into or right across the minefield.
The subsequent explosion of the hose will clear a lane 180 m long and 7.3 m wide.
It's reckoned that in a cleared lane, over 90% of anti-tank mines will have been destroyed.
Trailer Weight: 136 kg
Hose Length: 230 m
Cleared Zone: 180 m x 7.3 m wide
|
|
| |
| |