This snapshot taken on 01/02/2011, shows web content selected for preservation by The National Archives. External links, forms and search boxes may not work in archived websites.
Glossary

ALARPAs Low As Reasonably Practicable
APAssessment Phase
BNGBritish Nuclear Group
BPEOBest Practicable Environmental Option
CADMIDConcept, Assessment, Development, Manufacture, In-service Disposal
CIOPConsultation on ISOLUS Outline Proposals
CoRWMCommittee on Radioactive Waste Management
COSLAConvention of Scottish Local Authorities
Cut outThis term is used to refer to the option of cutting out the complete Reactor Compartment (RC), thus separating it from the rest of the submarine. The RC can then be stored intact, or cut up and packaged.
Cut upThis term is used to refer to the option of cutting up the Reactor Compartment and the items within it to reduce their size, so that the radioactive waste can be packaged in radioactive wastes containers and be more easily transported and stored.
CWECollaborative Working Environment
DADevolved Administrations
DBERRDepartment of Business and Regulatory Reform (ex-Department of Trade and Industry)
DCBDefence Contracts Bulletin
DDLPDe-Equip, De-Fuel and Lay-Up Preparations
DEDefence Estates
DEFRADepartment for the Environment, Fisheries and Rural Affairs
DE&SDefence Equipment & Support
DGDirector General
DGRPDirector General Resource and Planning
DfTDepartment for Transport
DLODefence Logistics Organisation (a department of the MOD)
DNEBDefence Nuclear Executive Board
DNSRDefence Nuclear Safety Regulator
DSM Director Submarines
DTIDepartment of Trade and Industry
EAEnvironment Agency
FECFront End Consultation – the first stage of consultation on Project ISOLUS
HISM Head of In-Service Submarines
HSEHealth & Safety Executive
IACISOLUS Advisory Committee
IAGISOLUS Advisory Group
ILWIntermediate Level Waste
ISOLUSInterim Storage of Laid-up Submarines
KURKey User Requirement
LLWLow Level Waste
LTBLong-Term Berthing
LUSMLaid-Up Submarine