This snapshot taken on 15/11/2009, shows web content selected for preservation by The National Archives. External links, forms and search boxes may not work in archived websites.
Latest
Home » Road Projects » Area 6 » A12 M25 Ipswich (A120/A12 - Harwich) » Publications » A12 and a120 route management strategy » A12 and a120 route management strategy
Contact us

by phone or email

Register for
email alerts

On information that's important to you

Feature

Better information for your journey

The National Traffic Control Centre collects real-time information on road conditions.

Quick Links

How We Manage Our Roads

In this section you can find out more about how we manage and maintain these roads and plan for the future

The Project Control Framework

On 1st April 2008 we launched the Project Control Framework. The Framework sets out how we, together with the Department for Transport, manage and deliver major improvement projects.

Traffic news on your desktop

Helpful ways to access the latest traffic information when you need it.

A12 and a120 route management strategy

9.3.21 Strategy Element

A12 and A120 Route Management Strategy

9.3.21 Strategy Element
Action: Investigate Active Traffic Management and Driver Information
Priority: Medium Ref: 7A
Initiation: The A12 is subject to severe congestion when incidentssuch as accidents occur, as suitable alternative routes are very limited. There iscurrently no effective method of getting news of delays to approaching drivers intime to allow suitable alternative routes to be used for drivers to rescheduletheir journeys. A real time information system is required.

Drivers frequently drive at inappropriate speeds for conditions ahead, such asfog, breakdowns, accidents and roadworks. This problem is exacerbated as the A12was not built to current design standards and has some tight radius curves.Resources for police enforcement of speed limits are limited.
Action description: The active management of traffic, through closemonitoring with cameras and vehicle detector loops, variable speed limits andmessage signs, etc is considered particularly appropriate along the A12 fromthe M25 to A120 Colchester.

North of the A120 Crown Interchange traffic flows are less and any benefitswould have to be carefully balanced against the environmental affects of thenecessary hardware, such as sign gantries, in the countryside which includesthe Dedham Vale Area of Outstanding Natural Beauty.
Objective(s) met: This proposal contributes to many objectives,environment OE5 and 6, safety OS1 to 4, and economy OC2 to 4.
Benefits: Accident rates and particularly their severitywill be reduced with the enforcement of appropriate speeds for the conditions.

Variable speed limits will reduce the breakdown of traffic flow and, henceimprove journey time reliability.

Drivers will benefit by being given alternatives to being stuck in queuingtraffic caused by incidents.
Timescale: Active traffic management and increased driverinformation will be investigated along this length once trials on other partsof the trunk road network, eg M25 variable speed limits have been completedand the MMS has reported.