This snapshot taken on 09/09/2010, shows web content selected for preservation by The National Archives. External links, forms and search boxes may not work in archived websites.

Latest traffic information

Breadcrumb Navigation

You are here:

  1. »
  2. Home »
  3. Road Projects »
  4. Area 11 »
  5. Road Project

Website Navigation

Useful Links

Feature

Better information for your journey

The National Traffic Control Centre collects real-time information on road conditions.

Quick Links

How We Manage Our Roads

In this section you can find out more about how we manage and maintain these roads and plan for the future

The Project Control Framework

This framework sets out how we, together with the Department for Transport, manage and deliver major road improvement projects.

Traffic news on your desktop

Helpful ways to access the latest traffic information when you need it.

M40 Junction 15 Improvement Scheme

M40 Junction 15 Improvement Scheme

Status
Completed
Located in
Area 11Map of the Agency's Operational Areas
Scheme type
OtherRoad Schemes Managed by the Highways Agency

The Project

The M40 junction 15 in Warwickshire is a busy interchange between the M40, A46 and the A429. The works, now completed, consisted of replacing the carriageway around the roundabout and on the northbound off and southbound on slips of the motorway. These slip roads were also widened to smooth the flow of traffic. The northern half of the circulatory roundabout was widened as was the A46 approach from Coventry. Finally an improved traffic signal system with new signing was installed.

Post Opening Project Evaluation

As part of our ongoing programme of Post Opening Project Evaluation (POPE) a study has been undertaken comparing the outturn effects of this scheme to the predicted impacts.  A summary of the report is available to download below. If you require a full version of the report, please contact us.