Feature
Better information for your journey
The National Traffic Control Centre collects real-time information on road conditions.
Quick Links
How We Manage Our Roads
In this section you can find out more about how we manage and maintain these roads and plan for the future
The Project Control Framework
This framework sets out how we, together with the Department for Transport, manage and deliver major road improvement projects.
Traffic news on your desktop
Helpful ways to access the latest traffic information when you need it.
A500 Etruria to Porthill Improvements
A500 Etruria to Porthill Improvements
- Status
- Completed
- Located in
- Area 9, Area 11

- Scheme type
- Other

The Project
Work was completed on 13 June 2010 to replace worn out road surface on both the northbound and southbound carriageways with new quieter material, to upgrade the lighting, and to replace safety fencing along a 3km (1.9 mile) stretch of the A500.
The lighting was removed from the central reserve and put in the verge alongside the A500. The pedestrian footpath was realigned to accomodate the lighting.
We also renewed and upgraded the illuminated and non-illuminated road signs and posts at various locations along the route and also carried out some drainage maintenance works.




