Feature
Better information for your journey
The National Traffic Control Centre collects real-time information on road conditions.
Quick Links
How We Manage Our Roads
In this section you can find out more about how we manage and maintain these roads and plan for the future
The Project Control Framework
This framework sets out how we, together with the Department for Transport, manage and deliver major road improvement projects.
Traffic news on your desktop
Helpful ways to access the latest traffic information when you need it.
A40 Highnam Woods Slope Stabilisation
A40 Highnam Woods Slope Stabilisation
The Project
A slope instability beside the A40 carriageway at Highnam Woods held a potential danger of significant land slip, which would close road for an extensive period if corrective action was not taken.
A temporary solution, involving re-grading of the existing slope and the fixing of new slabs at the base of the slope was undertaken, with a permanent solution planned for construction in approximately five years time.
To minimise disruption, the works were carried out at night between Sunday 7 March and Friday 12 March 2010 and were completed prior to commencement of the Cheltenham Racing festival.