This snapshot taken on 08/09/2010, shows web content selected for preservation by The National Archives. External links, forms and search boxes may not work in archived websites.

Latest traffic information

Breadcrumb Navigation

You are here:

  1. »
  2. Home »
  3. Road Projects »
  4. Area 4 »
  5. Road Project

Website Navigation

Useful Links

Feature

Better information for your journey

The National Traffic Control Centre collects real-time information on road conditions.

Quick Links

How We Manage Our Roads

In this section you can find out more about how we manage and maintain these roads and plan for the future

The Project Control Framework

This framework sets out how we, together with the Department for Transport, manage and deliver major road improvement projects.

Traffic news on your desktop

Helpful ways to access the latest traffic information when you need it.

A21 Pembury Bypass Slip Road Widening Works

A21 Pembury Bypass Slip Road Widening Works

Status
Completed
Located in
Area 4Map of the Agency's Operational Areas
Scheme type
OtherRoad Schemes Managed by the Highways Agency

The Project

Improvement work to reduce congestion on the A21 in Kent by widening the London-bound exit slip road at Pembury, near Tunbridge Wells was completed in November 2009.

The A21 London-bound exit slip road to the A228/A264 roundabout had its two-lane approach extended. This will reduce congestion around the slip road and help filter traffic wanting to turn left or right at the roundabout.