This snapshot taken on 03/03/2010, shows web content selected for preservation by The National Archives. External links, forms and search boxes may not work in archived websites.

Latest traffic information

Breadcrumb Navigation

You are here:

  1. Home »
  2. Road Projects »
  3. Area 9 »
  4. Road Project

Website Navigation

Useful Links

Feature

Better information for your journey

The National Traffic Control Centre collects real-time information on road conditions.

Quick Links

How We Manage Our Roads

In this section you can find out more about how we manage and maintain these roads and plan for the future

The Project Control Framework

On 1st April 2008 we launched the Project Control Framework. The Framework sets out how we, together with the Department for Transport, manage and deliver major improvement projects.

Traffic news on your desktop

Helpful ways to access the latest traffic information when you need it.

A49 Bayston Hill

A49 Bayston Hill

Status
Completed
Located in
Area 9Map of the Agency's Operational Areas
Scheme type
OtherRoad Schemes Managed by the Highways Agency

The Project

Where

The scheme is located on the A49 immediately south of the village of Bayston Hill

When

The works started on the 18 May 2009 and lasted for approximately 5 weeks.

What did we do ?

The re-surfacing works involved planing out berween 40mm and 150mm of the existing surfacing and replacing with new for a distance of 1.55km.

The work also included a small improvement scheme to the Condover turn.

Why did we need to do this work ?

The existing carriageway showed signs of deterioration through heavy surface crazing and deformation. It has required numerous areas of patching to keep it in a safe and serviceable condition for the road user.

Work at the Condover turn was identified as part of the Shrewsbury to Craven Arms Right turn study undertaken for the Highways Agency.