This snapshot taken on 03/03/2010, shows web content selected for preservation by The National Archives. External links, forms and search boxes may not work in archived websites.

Latest traffic information

Breadcrumb Navigation

You are here:

  1. Home »
  2. Road Projects »
  3. Area 9 »
  4. Road Project

Website Navigation

Useful Links

Feature

Better information for your journey

The National Traffic Control Centre collects real-time information on road conditions.

Quick Links

How We Manage Our Roads

In this section you can find out more about how we manage and maintain these roads and plan for the future

The Project Control Framework

On 1st April 2008 we launched the Project Control Framework. The Framework sets out how we, together with the Department for Transport, manage and deliver major improvement projects.

Traffic news on your desktop

Helpful ways to access the latest traffic information when you need it.

A49 Ludlow Bypass (North)

A49 Ludlow Bypass (North)

Status
Completed
Located in
Area 9Map of the Agency's Operational Areas
Scheme type
OtherRoad Schemes Managed by the Highways Agency

The Project

Work was carried out on the A49 Ludlow Bypass in Ludlow, Shropshire to resurface a 600 metre length of carriageway from the railway bridge northwards, between the northbound entry slip road and the southbound exit slip road.

Work started on the 9th March and was completed on 20 March 2009.

The improved road surface will provide an extended pavement life and remove the need for continued patching works.