This snapshot taken on 08/09/2010, shows web content selected for preservation by The National Archives. External links, forms and search boxes may not work in archived websites.

Latest traffic information

Breadcrumb Navigation

You are here:

  1. »
  2. Home »
  3. Road Projects »
  4. Area 1 »
  5. Road Project

Website Navigation

Useful Links

Feature

Better information for your journey

The National Traffic Control Centre collects real-time information on road conditions.

Quick Links

How We Manage Our Roads

In this section you can find out more about how we manage and maintain these roads and plan for the future

The Project Control Framework

This framework sets out how we, together with the Department for Transport, manage and deliver major road improvement projects.

Traffic news on your desktop

Helpful ways to access the latest traffic information when you need it.

A38 Harcombe to Exeter Racecourse Resurfacing

A38 Harcombe to Exeter Racecourse Resurfacing

Status
Completed
Located in
Area 1Map of the Agency's Operational Areas
Scheme type
OtherRoad Schemes Managed by the Highways Agency

The Project

This section of the A38 to the south of Exeter was adapted from the old turnpike road to its present form in 1972.

The surface is now showing signs of fatigue and requires replacement. The eastbound carriageway is being resurfaced with low noise material in time for the summer holiday traffic season. The opportunity is also being taken to upgrade the safety barrier, improve drainage from the road and upgrade the road signs.

In order to minimise disruption to traffic, the works are being carried out overnight, between 8.00pm and 6.00am the following morning, on Sunday to Thursday nights inclusive. This is to avoid disruption to early holiday traffic travelling on Friday and Saturday nights.

Work was completed in August 2008.