Feature
Better information for your journey
The National Traffic Control Centre collects real-time information on road conditions.
Quick Links
How We Manage Our Roads
In this section you can find out more about how we manage and maintain these roads and plan for the future
The Project Control Framework
This framework sets out how we, together with the Department for Transport, manage and deliver major road improvement projects.
Traffic news on your desktop
Helpful ways to access the latest traffic information when you need it.
A38 Dobwalls to Doublebois Footway Cycleway Link
A38 Dobwalls to Doublebois Footway Cycleway Link
The Project
The Highways Agency has provided a safe means of travel between the villages of Dobwalls and Doublebois for pedestrians and cyclists.
The A38 in this location is a single carriageway, with hedges and embankments close to the road. The footpath cycleway has been located away from the road as much as possible, and will assist travel not only between the two villages but will also now provide the link to connect the industrial area at Doublebois to the town of Liskeard for pedestrians and cyclists.
The trees and shrubs growing on the Cornish hedge were cut down in preparation of the works. This was done before the nesting season to prevent any loss of wildlife and the construction of the footpath started in early summer 2008.
The main works were undertaken during the late summer and were completed in November 2008.





